日韩一三区午夜剧场|97人妻中文字幕总站|2020久久国产精品爱|国产精品免费热播电影观看|伊人色综合久久久天天蜜桃|亚洲一区二区午夜在线观看|免费在线观看毛片小黄片最新|婷婷五月在线精品免费视频观看

Hello! Welcome to Suzhou Anke Zhongda Purifying Technology Co.,ltd.! HOME | Add favorites | English | 中文版
PRODUCTS LISTS
CONTACT US
For more details, please consult
0512-68249823
0512-68240292-812
13951112621
CONTACT:Mr zhang
Or leave a message for us
NewsLOCATION:HOME >News
How to purchase a return air grille
 Hits:5660 AddTime:2023/6/15 17:39:52
The selection of sewage treatment equipment grids includes the selection of grid section, determination of grid spacing, and selection of grid slag removal methods. The cross-sectional shapes of grid bars include squares, circles, rectangles, and rectangles with semicircles. Circular cross-section bars have good hydraulic conditions, low water flow resistance, but poor stiffness, and generally use rectangular bars. The cross-sectional shape of the grid bars can be selected according to the following table.
Determination of grid bar spacing
1. The clearance of the front grille of the water pump is determined according to the requirements of the water pump. (Refer to P178 Table 6-3 of the teaching material)
2. The determination of the spacing between the front grille of the sewage treatment system is generally as follows: manual slag removal: 25-40mm; Mechanical slag removal: 10-25mm.
3. Determination of slag amount: For domestic sewage, if there is a lack of information, it can be determined according to Table 6-4 of the textbook.
Determination of Design Parameters for Grating of Sewage Treatment Equipment
1. The flow rate of sewage in front of the fence is 0.4-0.9m/s;
2. Flow velocity through the grid: 0.6-1.0m/s;
3. The height difference h1 (head loss) between the bottom of the channel before and after the gate is generally taken as 0.08-0.15m;
4. Grid inclination angle: 45 °~75 °
Operation and Maintenance
For manual slag removal grilles: promptly remove and prevent blockage.
For mechanical slag removal grilles: ensure normal operation. Intermittent cleaning should be equipped with overload automatic protection devices.
Regular inspection and maintenance of all parts of the equipment are required, and maintenance records should be kept.
【Refresh】【Favorites】【Print】 【Close】
Previous:Design Techniques for Lighting System Configuration in Purification Workshop Next:How to use air shower passage and precautions

沙雅县| 石棉县| 武邑县| 正镶白旗| 北海市| 宜宾县| 寿宁县| 五大连池市| 廉江市| 富蕴县| 桂东县| 盐池县| 东乌珠穆沁旗| 沙河市| 监利县| 平凉市| 黔西县| 朝阳区| 新营市| 龙海市| 四子王旗| 加查县| 宁远县| 嵊州市| 娱乐| 共和县| 高陵县| 勐海县| 汨罗市| 莲花县| 富源县| 全州县| 三都| 邯郸市| 龙川县| 吐鲁番市| 高陵县| 南江县| 留坝县| 泰顺县| 荔浦县|